Home / By county / Massachusetts
Septic Systems in Nantucket County, Massachusetts
How much of Nantucket County the USDA rates as suitable for a septic drain field, what usually limits it, and the tank size Massachusetts requires.
Minimum tank size
Massachusetts is selected. Choose your bedrooms and press Calculate.
Drain field suitability in Nantucket County
Most rated land in Nantucket County is very limited for a standard drain field: 98% of it. Expect a site evaluation to point many lots toward a larger field, pressure distribution or an engineered system.
- 0% not limited
- 1% somewhat limited
- 70% very limited
- 29% not rated (urban land, water, pits)
Share of the soil survey area's 37,074 acres, by the USDA rating “ENG – Septic Tank Absorption Fields”. Ratings assume a standard gravity trench system with no site changes, so “very limited” means a conventional field needs special design, not that septic is impossible.
What limits drain fields here
The most common limiting factors in Nantucket County, as a share of all its land. One soil can have several, so the figures overlap.
Drains too fast65% of the county
Coarse soil at the bottom of the trench passes effluent through before it is treated, which risks groundwater.
Pretreatment units or a sand liner slow the flow and finish the treatment.
Poor filtering layer51% of the county
Very permeable material 2 to 5 feet down filters effluent poorly.
Pretreatment or added fill gives the effluent more treatment before it reaches that layer.
High water table16% of the county
The water table rises to within 4 to 6 feet of the surface for part of the year, leaving too little dry soil to treat effluent.
Mounds, sand filters or treatment units that need less separation are common answers.
Flood-prone ground16% of the county
The soil is on ground that floods, even if rarely, and a flooded drain field stops working.
Systems are placed above flood level, with watertight tanks and backflow protection.
Steep slopes14% of the county
Slopes over about 8% make it hard to keep trenches level and can let effluent seep out downhill.
Trenches are laid along the contour, often with serial distribution or drip dispersal.
Main soils in Nantucket County
The soils and land types covering the most ground. Search your address in the USDA Web Soil Survey to see which one is on your lot.
| Soil or land type | Share of county |
|---|---|
| Evesboro | 34.7% |
| Water | 13.2% |
| Plymouth | 7.6% |
| Riverhead | 6.0% |
| Water, Saline | 4.9% |
| Hooksan | 3.9% |
| Beaches | 3.4% |
| Freetown | 2.2% |
Massachusetts tank size rules
Title 5 requires a single-family tank to hold at least twice the design flow of 110 gallons a day per bedroom, or 48 hours of flow, whichever is greater, and never less than 1,500 gallons. A garbage grinder requires a two-compartment tank. Many local boards of health add stricter rules.
| Bedrooms | Minimum tank |
|---|---|
| 1 BR | 1,500 gal |
| 2 BR | 1,500 gal |
| 3 BR | 1,500 gal |
| 4 BR | 1,500 gal |
| 5 BR | 1,500 gal |
| 6 BR | 1,500 gal |
Source: 310 CMR 15.203 and 15.223 (Title 5).
Common questions
Can I put a conventional septic system in Nantucket County?
Often, but not everywhere. The USDA rates 2% of rated land here as not or only somewhat limited for a standard drain field and 98% as very limited. Only a site evaluation on your lot can say which you have.
What size septic tank do I need in Nantucket County?
Massachusetts's minimum is 1,500 gal for 3 bedrooms and 1,500 gal for 4. Your county can require more.
What is the most common septic problem with soil in Nantucket County?
Drains too fast, a limiting factor on about 65% of the county. Pretreatment units or a sand liner slow the flow and finish the treatment.
More in Massachusetts
Sources
- https://sdmdataaccess.sc.egov.usda.gov/
- https://websoilsurvey.nrcs.usda.gov/app/
- https://www.nrcs.usda.gov/resources/data-and-reports/soil-survey-interpretations
- https://www.epa.gov/septic/types-septic-systems
- https://www.mass.gov/files/documents/2016/09/tg/310cmr15clean.pdf
- https://pubs.nmsu.edu/_m/M113/