Septic Tank Calculator

Home / By county / Oregon

Septic Systems in Morrow County Area, Oregon

How much of Morrow County Area the USDA rates as suitable for a septic drain field, what usually limits it, and the tank size Oregon requires.

Count every room that could be used as a bedroom. Most states size the tank by bedrooms, not by who lives there now.
Used only for the pumping estimate.

Minimum tank size

Oregon is selected. Choose your bedrooms and press Calculate.

Drain field suitability in Morrow County Area

Soils in Morrow County Area are mixed: 80% of rated land is very limited and 20% is not or only somewhat limited. The answer depends on the lot, so the soil test matters more than the county average.

  • 0% not limited
  • 20% somewhat limited
  • 79% very limited
  • 1% not rated (urban land, water, pits)

Share of the soil survey area's 934,786 acres, by the USDA rating “ENG – Septic Tank Absorption Fields”. Ratings assume a standard gravity trench system with no site changes, so “very limited” means a conventional field needs special design, not that septic is impossible.

What limits drain fields here

The most common limiting factors in Morrow County Area, as a share of all its land. One soil can have several, so the figures overlap.

  • Slow-draining subsoil64% of the county

    Water moves too slowly through the soil 2 to 6 feet down, so effluent can back up or surface.

    Designers usually answer with a larger drain field, shallower trenches, pressure dosing or a mound.

  • Steep slopes58% of the county

    Slopes over about 8% make it hard to keep trenches level and can let effluent seep out downhill.

    Trenches are laid along the contour, often with serial distribution or drip dispersal.

  • Shallow bedrock52% of the county

    Rock lies within about 3 to 6 feet of the surface, so there is little soil to filter effluent before it reaches the rock.

    At-grade systems, mounds or drip dispersal add soil depth above the rock.

  • Large stones20% of the county

    Stones over 3 inches make up a quarter or more of the top 16 inches, which makes trenches hard to dig and level.

    Contractors may need heavier equipment or imported fill.

  • Poor filtering layer14% of the county

    Very permeable material 2 to 5 feet down filters effluent poorly.

    Pretreatment or added fill gives the effluent more treatment before it reaches that layer.

Main soils in Morrow County Area

The soils and land types covering the most ground. Search your address in the USDA Web Soil Survey to see which one is on your lot.

Soil or land typeShare of county
Ritzville11.9%
Valby9.1%
Quincy8.9%
Lickskillet7.4%
Waha7.0%
Morrow6.8%
Warden5.3%
Mikkalo4.0%

Oregon tank size rules

Homes with up to 4 bedrooms need at least 1,000 gallons, and larger homes at least 1,500. The permitting agent may require a larger tank.

BedroomsMinimum tank
1 BR1,000 gal
2 BR1,000 gal
3 BR1,000 gal
4 BR1,000 gal
5 BR1,500 gal
6 BR1,500 gal

Source: OAR 340-071-0220(3).

All Oregon septic rules

Common questions

Can I put a conventional septic system in Morrow County Area?

Often, but not everywhere. The USDA rates 20% of rated land here as not or only somewhat limited for a standard drain field and 80% as very limited. Only a site evaluation on your lot can say which you have.

What size septic tank do I need in Morrow County Area?

Oregon's minimum is 1,000 gal for 3 bedrooms and 1,000 gal for 4. Your county can require more.

What is the most common septic problem with soil in Morrow County Area?

Slow-draining subsoil, a limiting factor on about 64% of the county. Designers usually answer with a larger drain field, shallower trenches, pressure dosing or a mound.

Sources

  • https://sdmdataaccess.sc.egov.usda.gov/
  • https://websoilsurvey.nrcs.usda.gov/app/
  • https://www.nrcs.usda.gov/resources/data-and-reports/soil-survey-interpretations
  • https://www.epa.gov/septic/types-septic-systems
  • https://regulations.justia.com/states/oregon/chapter-340/division-71/section-340-071-0220/
  • https://pubs.nmsu.edu/_m/M113/