Minimum tank size
Choose your state and bedrooms, then press Calculate.
States that require more capacity
| State | Garbage disposal rule |
|---|---|
| Connecticut | Connecticut adds 250 gallons for a garbage grinder. |
| Georgia | Georgia adds 50% for a garbage grinder. |
| Illinois | Illinois uses a larger table when a garbage grinder is installed. |
| Kansas | Kansas guidance uses a larger table with a garbage disposal. |
| Kentucky | Kentucky adds 250 gallons for a garbage disposal. |
| Maine | Maine adds 30% for a garbage disposal. |
| New Hampshire | New Hampshire adds 50% for a garbage grinder and doubles the tank when raw sewage is pumped into it. |
| New Jersey | New Jersey adds 50% and requires a multi-compartment tank with a garbage grinder or a sewage ejector pump. |
| North Carolina | North Carolina doubles the tank when a garbage grinder or a lift pump comes before it. |
| Rhode Island | Rhode Island adds 250 gallons for a garbage grinder. |
Massachusetts requires a two-compartment tank with a garbage grinder, and North Dakota's sizes already allow for one. Elsewhere your county may set its own rule.
What the EPA advises
Limit or avoid the disposal, because food waste adds solids to the tank. If you use one, expect to pump more often. Never put grease, oil or coffee grounds down it.
Common questions
How much more often will I pump with a disposal?
No federal figure exists, but Maine's 30%, Georgia's 50% and North Carolina's doubling of tank size show how much extra solids the states expect.
Related pages
Sources
- https://www.epa.gov/septic/how-care-your-septic-system
- https://trellis.law/state-rules/nj/administrative-code/title-7-environmental-protection/chapter-9a-standards-for-individual-subsurface-sewage-disposal-systems/subchapter-8-pretreatment-components/section-79a-82-septic-tanks
- https://portal.ct.gov/-/media/Departments-and-Agencies/DPH/dph/environmental_health/environmental_engineering/Tech-Standards-2023/TS-Master-2023-12292022.pdf
- https://www.law.cornell.edu/regulations/georgia/Ga-Comp-R-Regs-R-511-3-1-.05
- https://www.ilga.gov/commission/jcar/admincode/077/07700905zz9996afR.html
- https://saline.govbuilt.com/media/environmental-health/septic/requirements-for-permitting-a-septic-system-12-8-2014.pdf
- https://apps.legislature.ky.gov/law/kar/downloads/docs/8806/document.engrossed.pdf
- https://regulations.justia.com/states/maine/10/144/chapter-241/section-144-241-7
- https://regulations.justia.com/states/new-hampshire/env/subtitle-env-wq/chapter-env-wq-1000/part-env-wq-1010/section-env-wq-1010-01
- https://www.owpnc.com/18e-rules-nc/0801-septic-tank-capacity-requirements
- https://d1tvxue8o4w0fl.cloudfront.net/regulation/rhode-island-administrative-code/title-250-department-of-environmental-management/chapter-150-water-resources/subchapter-10-wastewater-and-storm-water/part-6-rules-establishing-minimum-standards-relating-to-location-design-construction-and-maintenance-of-onsite-wastewater-treatment-systems/section-250-ricr-150-10-627-septic-tanks